Installation Request Form

Phase Diagram
NB Approach Top-down map view · traffic flowing north (up)
3 lanes
PED
1
2
3
SB Approach Top-down map view · traffic flowing south (down)
3 lanes
1
2
3
PED
EB Approach Top-down map view · traffic flowing east (right)
3 lanes
1
2
3
PED
WB Approach Top-down map view · traffic flowing west (left)
3 lanes
PED
1
2
3
Approach Sensor S/N
Notes
Phase Summary

One row per cabinet load-switch slot (Φ1–Φ16). Pick a Type per slot (Vehicle, Ped 2/4/6/8, or OL-A–D); Vehicle and Count chips are pulled from the diagram. This is what gets printed or saved as PDF.

Phase Type Vehicle Advanced Count
Please contact support@notraffic.tech to schedule your updates.
Additional Products

Select any purchased products for this intersection that will need to be configured.

Setup & config
Signal Timing File Required for Optimization

Upload the current signal timing file (PDF, image, spreadsheet, or plain text) so our team can build the optimization baseline.

Remote Front Panel — Controller Network Required for Remote Front Panel

We need the controller make/model plus routable network details for the signal controller so the remote front panel can reach it.

Supporting Documents

Already have these? Attach them here instead of filling out the matching sections above.

10 MB per file · 50 MB total
Phasing Diagram PDF, PNG, JPEG
Sensor S/N Photos JPEG, PNG, HEIC · up to 8
Detector Mapping PDF, image, spreadsheet